HomeCase Studies
Verified Industrial Yields

Real-World Rooftop Case Studies

Explore audited engineering yields, daytime baseload offsets, and verified annual cost savings delivered across Bangladesh’s industrial corridors.

1.2 MWp Rooftop Solar Microgrid
Industrial RMG1200 kWp Installed
Gazipur Industrial Zone, BangladeshApex Textile & Knitting Mills

1.2 MWp Rooftop Solar Microgrid

Turnkey installation across 4 corrugated textile shed roofs with bifacial Tier-1 modules, achieving LEED Platinum energy compliance benchmarks.

Bill Reduction
-42%
Annual Savings
17.7 Million BDT
CO2 Abated
893 T/yr
Engineering Highlights:
N-Type Bifacial TOPCon 585WHuawei 100KTL High-Yield InvertersCustom Anodized Rail MountingBPDB Net-Metering Substation
Simple Payback: 3.3 YearsSimulate Your Site
850 kWp Clean Energy Industrial Hub
Heavy Industry850 kWp Installed
Kashimpur, Gazipur, BangladeshGazipur Industrial Logistics Park

850 kWp Clean Energy Industrial Hub

Corporate PPA project engineered with zero upfront client capital, delivering uninterrupted clean energy alongside captive diesel generators.

Bill Reduction
-36%
Annual Savings
12.5 Million BDT
CO2 Abated
632 T/yr
Engineering Highlights:
Solar PPA ModelDiesel Generator PV ControllerAutomated Sprinkler Dust CleaningFiber-Optic SCADA Bus
Simple Payback: 3.5 YearsSimulate Your Site
450 kWp Commercial Net-Metered Canopy
Commercial450 kWp Installed
Tejgaon Industrial Area, DhakaTejgaon Commercial Hub Plaza

450 kWp Commercial Net-Metered Canopy

Urban rooftop canopy structure preserving 100% rooftop floor utility while offsetting high-tariff commercial AC load during peak hours.

Bill Reduction
-48%
Annual Savings
7.6 Million BDT
CO2 Abated
339 T/yr
Engineering Highlights:
Structural Steel Elevated CanopyDESCO Bi-Directional Net-MeterRapid Shutdown Safety ProtocolReal-time Tenant Billing Metering
Simple Payback: 3.2 YearsSimulate Your Site
2.1 MWp Heavy Industrial PV Array
Heavy Industry2100 kWp Installed
Sitakunda, ChattogramChattogram Marine Steel Works

2.1 MWp Heavy Industrial PV Array

Coastal heavy industry deployment engineered to withstand Category-4 cyclone wind loads (up to 210 km/h) with marine-grade fasteners.

Bill Reduction
-28%
Annual Savings
31.2 Million BDT
CO2 Abated
1572 T/yr
Engineering Highlights:
Marine-Grade Aluminium Structure33kV Direct Step-up TransformerHarmonic Distortion MitigationWeather Station Irradiance Sensors
Simple Payback: 3.4 YearsSimulate Your Site