HomeSolar Feasibility Sizing Engine
Institutional Engineering Suite

Commercial Solar Sizing & 25-Year Financial Modeler

Model specific yields, BPDB net-metering transformer caps, diesel fuel saver synchronization, and 25-year cumulative cash-flow trajectories.

Monthly Electricity Bill (BDT)Adjust slider or type exact bill amount
BDT
100,000 BDT2,550,000 BDT5,000,000 BDT
Transformer Sanctioned RatingBPDB Net-Metering policy limits solar capacity to 70% of transformer kVA
630 kVA
Net-Metering Eligible: System size (372 kWp) ≤ 70% cap (441 kWp)
Diesel-PV Hybrid Fuel Saver Synchronization (DPC)Automatically throttles solar output to save diesel during grid power cuts
Engineered System Sizing
372 kWp

Annual Harvest: ~470,064 kWh

Rooftop Area Footprint:~37,200 sq ft
Monthly Clean Energy Yield:~39,172 kWh / month
Turnkey CapEx Investment:~23,064,000 BDT
Estimated Monthly Savings:~450,478 BDT
Simple Payback Period:~4.3 Years
Annual Carbon Abatement:~291.4 Tons CO2/yr
Send Parameters to Solar Engineer on WhatsApp
Industrial Rooftop Solar Infrastructure
Tier-1 Bifacial Architecture
Turnkey EPC & Zero-CapEx PPA Infrastructure
Calibrated for 4.5 Peak Sun Hours across Bangladesh's Industrial Corridors
Cash Flow Dynamics

25-Year Cumulative Financial Trajectory

Comparing Status Quo Grid Spend vs SolarNett Turnkey Installation vs Savings

Initial Turnkey Investment: ~23,064,000 BDTExpected 25-Year Net Cash Yield: +160.70 Million BDTCapital Breakeven: ~4.3 Years
TimelineGrid Status Quo ExpenseTurnkey Solar Net PositionCumulative Solar Savings
Year 15.41M BDT-17.66M BDT+17.66M BDT
Year 316.71M BDT-6.44M BDT+6.44M BDT
Year 528.70M BDT+5.34M BDT+5.34M BDT
Year 1061.97M BDT+37.44M BDT+37.44M BDT
Year 15100.54M BDT+73.68M BDT+73.68M BDT
Year 20145.25M BDT+114.58M BDT+114.58M BDT
Year 25197.09M BDT+160.70M BDT+160.70M BDT