Commercial & Industrial Clean Energy

Switch to Solar,
Make the sun work for you.

We engineer, procure, and finance utility-grade rooftop solar arrays that hedge your manufacturing operations against escalating utility tariffs—delivering immediate 25% to 40% operational power savings.

SREDA Enlisted Grade-A
BPDB & DESCO Net-Metering
IEEE 1547 & BNBC Certified
SolarNett High-Yield Industrial Clean Energy Rooftop
Live Regional Telemetry
Active Generation: 68.4 MWp

Milestones At A Glance

120+
MWp Deployed Capacity
60+
Industrial Rooftops
24/7
Engineering RMS Telemetry
98.4%
Grid Synchronization Rate
82,000
Tons CO2 Offset Annually
46,000
Megawatt Hours Generated
18,500
Panels Synchronized
12,400,000+
BDT Client Grid Savings
Interactive Feasibility Engine

Simulate Your Factory Solar Economics

Calculate optimal array sizing, daytime grid displacement, and commercial payback benchmarks calibrated to regional solar irradiance (4.5 PSH).

Monthly Industrial Utility BillAdjust slider or type exact bill amount
BDT
100,000 BDT2,550,000 BDT5,000,000 BDT
Financing Model Comparison
Recommended System Size
372 kWp

Requires ~37,200 sq ft clear rooftop

Est. Monthly Savings
~450,478 BDT
Displaced utility spend
Simple Payback
4.3 Years
CapEx breakeven
Annual CO2 Offset
291.4 Tons
Certified carbon avoidance
Estimated Investment
~23.06M BDT
Turnkey procurement

Instant generation • SolarNett Rapid Assessment System • No obligation

Grow With SolarNett

Engineered for Industrial Balance Sheets.

SolarNett Industrial Installation Engineers
Tier-1 EPC Procurement
Structural Load & Ultrasonic Audited25-Yr Design

In an industrial landscape where commercial power tariffs escalate annually and global buyers demand verified supply chain decarbonization, SolarNett treats rooftop solar not as an ephemeral fixture, but as an institutional capital asset. Our engineering desk analyzes facilities from first principles—conducting structural dead/live load modeling, non-destructive PEB ultrasonic audits, and substation harmonic compatibility testing.

Whether structured through 100% Turnkey CapEx with an accelerated 3.5-year capital payback or our zero-investment Corporate PPA model, each installation synchronizes autonomously with captive diesel generators and BPDB/DESCO net-metering switchboards. The outcome is absolute operational continuity and guaranteed double-digit energy cost reduction across a 25-year design lifespan.

Capital Flexibility

Three ways to put the sun on your balance sheet.

Select the optimal financial and operational model aligned with your corporate treasury and ESG benchmarks.

Turnkey CapEx

Turnkey CapEx

Asset Ownership • 3.5-Year Payback

100% asset equity from Day 1. Complete end-to-end engineering, procurement, and construction delivering accelerated capital payback and 21+ years of unencumbered power savings.

Corporate PPA

Corporate PPA

Zero Capital • Discount Grid Tariff

Zero upfront capital investment. SolarNett designs, funds, installs, and maintains the rooftop array at our expense. You simply purchase the generated power at an agreed discounted rate.

EPC + Financing

EPC + Financing

Hybrid Concessionary Debt

Low-interest green financing structured via IDCOL and central bank refinance schemes. Monthly utility savings cover loan repayments, transitioning the plant to debt-free ownership in 5-7 years.

Operational Portfolio

Industrial Rooftop Microgrids

Audited monthly bill reductions, daytime factory baseload offsets, and verified generation records.

Industrial RMG1200 kWp

1.2 MWp Rooftop Solar Microgrid

Apex Textile & Knitting Mills • Gazipur Industrial Zone, Bangladesh

Turnkey installation across 4 corrugated textile shed roofs with bifacial Tier-1 modules, achieving LEED Platinum energy compliance benchmarks.

Bill Reduction
-42% Monthly
Annual Savings
17.7 Million BDT
Examine Technical Yield
Heavy Industry850 kWp

850 kWp Clean Energy Industrial Hub

Gazipur Industrial Logistics Park • Kashimpur, Gazipur, Bangladesh

Corporate PPA project engineered with zero upfront client capital, delivering uninterrupted clean energy alongside captive diesel generators.

Bill Reduction
-36% Monthly
Annual Savings
12.5 Million BDT
Examine Technical Yield
Commercial450 kWp

450 kWp Commercial Net-Metered Canopy

Tejgaon Commercial Hub Plaza • Tejgaon Industrial Area, Dhaka

Urban rooftop canopy structure preserving 100% rooftop floor utility while offsetting high-tariff commercial AC load during peak hours.

Bill Reduction
-48% Monthly
Annual Savings
7.6 Million BDT
Examine Technical Yield
Engineering Feasibility Desk

Get Your Factory Rooftop Sized in 24 Hours

Send us your factory electricity bill and shed dimensions. Our engineering desk delivers a bankable PVSyst yield model and CapEx/PPA financial comparison within 24 hours.